Conair 5000 Podręcznik Użytkownika Strona 39

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 38
Mounting a Loader on the Hopper
If you have a Conair loader or vacuum receiver, you can
use the flange and mounting clips provided on the top of
the hopper. Refer to the manual that came with your
receiver or loader for detailed installation instructions.
Testing the Installation
You have completed the installation. Now it’s time to make sure everything works.
1 Make sure there is no material in the hopper. If you have mounted a loader
or vacuum receiver on the hopper, disconnect the material inlet hose at the
source.
2 Turn on the main power to the dryer. Make sure the dryer’s disconnect dial is
in the ON position. This powers up the control and the display lights will illu-
minate.
3 Press the START button.
If everything is installed correctly:
The green light on the start button will illuminate.
The regeneration and process blowers and LEDs will turn on.
The regeneration heater and LED will turn on.
The LEDs will illuminate.
The desiccant wheel starts turning.
(continued)
Auto Start
Dryer Status
Process Blower Regen. Blower
Regen. Heater
Set Point Actual
1 Process Temp.
2 Regen. Temp.
3 Return Air Temp.
4 Auto Start
5 Load Time (MDC)
6 Activate Setback Temp.
7 Setback Temp.(Process)
8 Dewpoint
Shutdown Alarms
A1 Process High Temp
A2 Process Loop Break
A3 Process Heater High Temp
A4 Regen Heater High Temp
A7 Return Air High Temp
A49 Process Protection High Temp
A53 Process Blower Overload
A55 Wheel Rotation Failure
Passive Alarms
P1 Process Temp Deviation
P3 Regen Temp Deviation
P5 Return Air Mid High Temp
P17 MDC Conveying Demand
1000
Start
IMPORTANT: Be sure the cable tie
has been removed from the desic-
cant wheel. (W600-1000 models)
Installation l 3-19
3
Installation
Przeglądanie stron 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 110 111

Komentarze do niniejszej Instrukcji

Brak uwag